Strike South Pty Ltd : (a subsidiary of Strike Energy Limited)
Location : South Erregulla Precinct, Perth Basin, Western Australia
Project Overview
Strike Energy is progressing the development of the South Erregulla Peaking Power Plant (SEPPP) — an 85 MW gas-fired power station forming part of Strike’s integrated energy development within the South Erregulla Precinct. The project leverages gas from the South Erregulla field (Production Licence L24) to provide fast-start generation capacity to the South West Interconnected System (SWIS), supporting the firming of renewable energy within the Wholesale Electricity Market (WEM).Awarded Certified Reserve Capacity (CRC) by the Australian Energy Market Operator (AEMO), SEPPP represents Strike’s first step into electricity generation — a major strategic milestone for the organisation as it transitions toward a fully integrated energy producer.
Owner’s Engineer – Electrical Systems, Integration and Operations Readiness
Devbase Group has been engaged by Strike South Pty Ltd to provide ongoing support to the senior leadership team through the role of Owner’s Engineer. Our focus is on managing and integrating the design, commissioning, and operational readiness of all electrical and instrumentation systems across the power plant and associated 132 kV transmission line connecting to Western Power’s network. Devbase’s engagement encompasses both technical assurance and strategic oversight, including the development of assurance frameworks and risk reporting mechanisms that inform executive and board-level communications.Our scope of work includes:
The project is in active development with Devbase continuing to provide Executive Advisory and Owner’s engineer support through detailed design finalisation, procurement, and early commissioning preparation stages. Our involvement is ensuring that technical, organisational, and compliance requirements are aligned to enable a safe and successful energisation and long-term operation within the SWIS.
| Project | South Erregulla Peaking Power Plant (SEPPP) |
|---|---|
| Capacity | 85 MW Peaking Gas Power Station |
| Grid | South West Interconnected System (SWIS) |
| Client | Strike South Pty Ltd (subsidiary of Strike Energy) |
| Devbase Role | Owner’s Engineer – HV Systems & Project Operations Readiness |
| Connection | 132 kV Transmission Line to Western Power Network |
| Focus Areas | Design Assurance, HV Integration, Risk Oversight, Leadership Support, Licensing Enablement |
Devbase’s ongoing involvement is providing Strike with confidence and governance assurance as it delivers its first high-voltage asset and transitions toward integrated energy operations. Our structured, risk-informed approach ensures that the South Erregulla Power Plant is not only technically robust but also organisationally ready to operate within Western Australia’s regulated electricity market.